|
G703™-1992: Continuation Sheet
G702™-1992 and G703™-1992 are documents designed to be used in conjunction with each other, and provide convenient and complete forms on which the contractor can apply for payment and the architect can certify that payment is due. The forms require the contractor to show the status of the contract sum to date, including the total dollar amount of the work completed and stored to date, the amount of retainage (if any), the total of previous payments, a summary of change orders, and the amount of current payment requested.
G703™-1992, Continuation Sheet, breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. (Note: The AIA does not publish a standard schedule of values form.)
G702™-1992 serves as both the contractor's application and the architect's certification. Its use can expedite payment and reduce the possibility of error. If the application is properly completed and acceptable to the architect, the architect's signature certifies to the owner that a payment in the amount indicated is due to the contractor. The form also allows the architect to certify an amount different than the amount applied for, with explanation provided by the architect. Sold in packs of 50.
Product Number: 635.3-G703
Your Price: $199.99
|
|
|