AIA Florida

Home | Log-In | Search | Contact Us

Facebook Twitter Instagram YouTube LinkedIn

A Chapter of the American Institute of Architects

Looking for an architect? Are you an architect? Are you a student?

 
Upcoming Events   Contract Documents
 
Continuing Education   On Demand Continuing Education
 

A New Solution for Bridge Construction: GRS-IBS­ (1 LU | HSW)

Return to: Calendar

Start: Thursday, August 11, 2022

Location: Virtual

Time: 1 p.m. Eastern

Web Site: https://www.echelonmasonry.com/oldcastle-apg-university-online

A New Solution for Bridge Construction: GRS-IBS­­(1 LU | HSW)

With the nation’s roadway infrastructure continuing to deteriorate, there is more demand than ever for cost-effective road and bridge construction methods.­

Join experts from Oldcastle APG to explore one of the most innovative solutions available today: geosynthetic reinforced soil-integrated bridge systems, or GRS-IBS.

This course introduces the GRS-IBS solution that eliminates driven piles and poured concrete by building the bridge structure direly on a reinforced subsoil mass using similar methods as segmental retaining walls (SRW), a new technique that promises to revolutionize the speed and cost efficiency of bridge construction.

 

©2026 AIA Florida.   Contact Us · Privacy Policy