AIA Florida

Home | Log-In | Search | Contact Us

Facebook Twitter LinkedIn YouTube

A Chapter of the American Institute of Architects

Looking for an architect? Are you an architect? Are you a student?

 
Continuing Education   Advocacy Issues
 
Contract Documents   Upcoming Events
 

A134™–2009 (formerly A131™CMc–2003): Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guarantee Maximum Price

Similar to A133–2009, this construction manager as constructor agreement is intended for use when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction. However, in AIA Document A134–2009 the construction manager does not provide a Guaranteed Maximum Price (GMP). A134–2009 employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds. The agreement divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A134–2009 is coordinated for use with AIA Documents A201™–2007, General Conditions of the Contract for Construction, and B103™–2007, Standard Form of Agreement Between Owner and Architect for a Large or Complex Project. NOTE: A131CMc–2003 expires on May 31, 2010. CAUTION: To avoid confusion and ambiguity, do not use this construction management document with any other AIA construction management document.

Product Number: 635.3 - A134

Your Price: $24.99

Quantity:

 

©2017 AIA Florida.   Contact Us · Privacy Policy