AIA Florida

Home | Log-In | Search | Contact Us

Facebook Twitter LinkedIn YouTube

A Chapter of the American Institute of Architects

Looking for an architect? Are you an architect? Are you a student?

 
Continuing Education   Advocacy Issues
 
Contract Documents   Fall Hot Topics
 

B210™–2007 (formerly B210-2004): Form provides owner with measures to ensure the proper function and maintenance of the building and site after final completion.

B210–2007 focuses attention on providing the owner with means and measures to ensure the proper function and maintenance of the building and site after final completion. This scope provides a menu of choices of services, including initial existing condition surveys of the building and its systems, evaluation of operating costs, and code compliance reviews. B210–2007 may be used in two ways: (1) incorporated into the owner-architect agreement as the architect’s sole scope of services or in conjunction with other scopes of services documents, or (2) attached to G802™–2007, Amendment to the Professional Services Agreement, to create a modification to an existing owner-architect agreement. B210–2007 is a scope of services document only and may not be used as a stand-alone owner-architect agreement. B210–2007 was revised in 2007 to align, as applicable, with B101–2007.

Product Number: 635.3 - B210

Your Price: $9.99

Quantity:

 

©2017 AIA Florida.   Contact Us · Privacy Policy