AIA Florida

Home | Log-In | Search | Contact Us

Facebook Twitter LinkedIn YouTube

A Chapter of the American Institute of Architects

Looking for an architect? Are you an architect? Are you a student?

 
Continuing Education   Advocacy Issues
 
Contract Documents   Upcoming Events
 

A141™-2014: Agreement Between Owner and Design-Builder

A141-2014™ replaces A191™-1996 and consists of the Agreement and three exhibits, Exhibit A, Terms and Conditions, Exhibit B, Determination of the Cost of the Work, and Exhibit C, Insurance and Bonds. Exhibit B is not applicable if the parties select to use a Stipulated Sum. A141 obligates the Design-Builder to execute fully the Work required by the Design-Build Documents, which include A141 with its attached exhibits, the project criteria and the design-builder’s proposal, including any revisions to those documents accepted by the owner, supplementary and other conditions, addenda and modifications. The Agreement requires the parties to select the payment type from three choices: (1) Stipulated Sum, (2) Cost of the Work Plus Design-Builder’s Fee, and (3) Cost of the Work Plus Design-Builder’s Fee with a Guaranteed Maximum Price. A141™ with its attached exhibits forms the nucleus of the Design-Build Contract. Because A141 includes its own Terms and Conditions, it does not use A201™-1997.

Product Number: 635.3 - A141

Your Price: $24.99

Quantity:

 

©2017 AIA Florida.   Contact Us · Privacy Policy