AIA Florida

Home | Log-In | Search | Contact Us

Facebook Twitter LinkedIn YouTube

A Chapter of the American Institute of Architects

Looking for an architect? Are you an architect? Are you a student?

 
Continuing Education   Advocacy Issues
 
Contract Documents   Upcoming Events
 

A133™–2009 (formerly A121™CMc–2003): Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

AIA Document A133–2009 is intended for use on projects where a construction manager, in addition to serving as adviser to the owner, assumes financial responsibility for construction of the project. The construction manager provides the owner with a guaranteed maximum price proposal, which the owner may accept, reject, or negotiate. Upon the owner’s acceptance of the proposal by execution of an amendment, the construction manager becomes contractually bound to provide labor and materials for the project and to complete construction at or below the guaranteed maximum price. The document divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A133–2009 is coordinated for use with AIA Documents A201™–2007, General Conditions of the Contract for Construction, and B103™–2007, Standard Form of Agreement Between Owner and Architect for a Large or Complex Project. NOTE: A121CMc–2003 expires on May 31, 2010. CAUTION: To avoid confusion and ambiguity, do not use this construction management document with any other AIA construction management document.

Product Number: 635.3 - A133

Your Price: $24.99

Quantity:

 

©2017 AIA Florida.   Contact Us · Privacy Policy